Week #26 - July 18th to July 24th - Project report, Presentation, testing
Did some quick testing with the device in a hot vehicle. Worked on some final things to add to the report before the final submission....
Bryan Menendez
Jul 25, 20231 min read
8 views
0 comments
Week #26 - July 18th to July 24th - Project report & Presentation
This week we made final edits to the project report and incorporated the code in the appendix. I updated the website main page with an...
jmorra0
Jul 25, 20231 min read
0 views
0 comments


Week #25 - July 10th to July 17th - Project report
This week I focused most of my efforts on corrections and updates to the final report. Part of those updates involved some additional...
jmorra0
Jul 18, 20231 min read
8 views
0 comments


Week #25 - July 10th to July 17th - Project report, Testing, Final Case
Made a few additional changes to the report alongside some of the items James added. Added some information about the testing we did, and...
Bryan Menendez
Jul 17, 20231 min read
2 views
0 comments
Week #24 - July 4th to July 10th - Project report and testing
A lot of this week was catching up from the limited amount I had last week due to some work travel I had to do. Following my arrival from...
Bryan Menendez
Jul 11, 20232 min read
2 views
0 comments


Week #24 - July 4th to July 10th - Complete Live Vehicle Testing - Work on Bulk of Final Report
This week I spent many hours getting the bulk of the final report sections completed for the source code and program operation. I also...
jmorra0
Jul 10, 20232 min read
3 views
0 comments


Week #23 - June 28th to July 3rd - Start Working on Report and Documenting System Control
I started working on the final report and re-organized the proposal to make room for the new components needed. A link to the draft...
jmorra0
Jul 4, 20231 min read
0 views
0 comments


Week #23 - June 27th to July 4rd - Temperature testing, CAD redesign and print, project report.
This week we could not meet with Dr. Ejaz due to some complication with schedules. This week I traveled to British Columbia, Canada for a...
Bryan Menendez
Jul 4, 20231 min read
1 view
0 comments


Week #22 - June 20th to June 27th - Cleanup GUI, and Finalize the Datalog and Tech Window
This week we finalized nearly all of the required parts of the gui and are ready to do live testing from the device on an actual vehicle....
jmorra0
Jun 27, 20232 min read
3 views
0 comments


Week #22 - June 20th to June 27th - CAD Rendering and GUI
Created a larger casing for the project. Also divided it into three separate pieces that are assembled which should help with putting the...
Bryan Menendez
Jun 26, 20231 min read
2 views
0 comments


Week #21 - June 13th to June 19th - CAN Filtering and GPIO
This week I focused on getting the One-Wire GPIO sensor working on the device. There are numerous tutorials online to show the basics of...
jmorra0
Jun 20, 20233 min read
3 views
0 comments


Week #21 - June 13th to June 19th - CAN HMI assembly and GUI
Put the entire system into the 3D printed case. Everything is working but a few flaws in our original design became apparent. These will...
Bryan Menendez
Jun 19, 20231 min read
5 views
0 comments


Week #20 - June 6th to June 12th - GUI and CAD
This week I worked with the printer to get an acceptable file to them for printing. Got something over to them and got it printing,...
Bryan Menendez
Jun 13, 20231 min read
3 views
0 comments


Week #20 - June 6th to June 12th - Datalogging Configuration
I started off this week to work on the datalogging portion of the project, but first had to re-configure the whole project so far to put...
jmorra0
Jun 12, 20232 min read
4 views
0 comments
Week #19 - May 30th to June 5th - Software & Final Battery Testing completed
The additional power switch arrived and I tested it out. It does not switch to the backup battery fast enough to not interrupt power to...
Bryan Menendez
Jun 6, 20231 min read
2 views
0 comments


Week #19 - May 30th to June 5th - Threads and Charts
This week I completed making separate threads operate in they python GUI so that the CAN signals can be updated in the background and the...
jmorra0
Jun 5, 20232 min read
1 view
0 comments


Week #18 - May 23rd to May 29th - GUI Progress, CAD Rendering, finished battery.
To being, I ordered the final solution for the battery on the device and tested it. The 12V 2000 mAH battery functions. All the testing...
Bryan Menendez
May 30, 20232 min read
1 view
0 comments


Week #18 - May 23rd to May 29th - GUI Progress Update Website
This week was a lot of work for programming the GUI. The original thought was to program with Tkinter, but that proved to be very time...
jmorra0
May 29, 20232 min read
5 views
0 comments


Week #17 - May 16th to May 22nd - Powering the CAN HMI
This week I focused on how we were going to power the CAN HMI with both DC power and a battery. I found two key components on Amazon to...
Bryan Menendez
May 23, 20231 min read
1 view
0 comments


Week #17 - May 16th to May 22nd - GUI Design - 7 Inch Display
This week I started on the GUI design in python and created a base GUI screen for the main program including the buttons to access each...
jmorra0
May 23, 20231 min read