I started working on the final report and re-organized the proposal to make room for the new components needed. A link to the draft report has been added to the website.

I created the program flow charts to describe the overall layout of the program as shown in the images below.


While reviewing the flowcharts and the code there were some additional items that needed to be addresses in the code, which I will work on this week.

I also constructed a basic box to contain the second unit for remote testing on vehicles at work. It will use similar hardware to what is used on the primary unit that Bryan has. The case below just holds the raspberry pi a basic power converter and loosely holds the screen so that it does not get damaged while testing.



This week I intend to do some on the vehicle testing and datalogging ability for long lengths of time to confirm the consistency in the recording of CAN frames form the vehicle as required for some of our engineering requirements.

 
 
 